 Started driving piling on 1/14/2010 |
 They jackhammer holes in the frozen ground to keep the pipes from sliding out of its location |
 East side of bin and tunnel |
 Busting up concrete to make room for bins and dryer |
 Thawing the ground for grain dryer slab |
 160 degree fluid is pumped through the hoses to thaw the ground |
 Grain dryer rebar in place and ready for cement |
 Pouring the dryer pad on a cold day with hot mix (2/25/10) |
 Driving the last of the pipe pile into the ground |